Required Inspection Codes By Project

(*) indicates additional inspection may be required due to scope of work or permit trade.

Inspection Code Definitions

Project Description Required Inspections
DEPARTMENT Building Electrical Mechanical Plumbing
A/C REPLACEMENT E= (Electrical Final) H= (Heating Final)
ADDING RECEPTACLES ER (Electrical Rough), ER= (Electrical Rough and Final), ESL* (Electrical Slab*), E= (Electrical Final)
ADDITION BFT (Building Footing), BFN (Building Foundation), BFD (Building Foundation Drain), BFI (Building Foundation Insulation), BFR (Building Frame), BIN (Building Insulation), BLA (Building Lath), BTR (Building Tile Roof), BEN=* (Building Energy Final*), B= (Building Final) ES* (Electrical Service*), ER (Electrical Rough), E= (Electrical Final) HI* (Heating Inside*), HWP* (Heating Process Steam and Water Pipe*), HRR (Heating Residential Rough), H= (Heating Final) PB (Plumbing Base), PTO (Plumbing Top Out), PIN* (Plumbing Insulation*), P= (Plumbing Final)
BASEMENT FINISH BFR (Building Frame), B= (Building Final) ES* (Electrical Service*), ER (Electrical Rough), ERS* (Electrical Rough and Service*), ESL* (Electrical Slab*), EP* (Electrical Panel*), E= (Electrical Final) HI (Heating Inside), HWP* (Heating Process Steam and Water Pipe*), HRR (Heating Residential Rough), H= (Heating Final) PB (Plumbing Base), PTO (Plumbing Top Out), PIN* (Plumbing Insulation*), P= (Plumbing Final)
BATH EXHAUST FAN (NEW) ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) H= (Heating Final)
BOILER INSTALL (NEW) ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) HI (Heating Inside), HWP (Heating Process Steam and Water Pipe), H= (Heating Final) PTO* (Plumbing Top Out*), P=* (Plumbing Final*)
BOILER REPLACEMENT (W/ VENT) ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), E= (Electrical Final) HWP* (Heating Process Steam and Water Pipe*), H= (Heating Final) PTO* (Plumbing Top Out*), P=* (Plumbing Final*)
DECK BFT (Building Footing), BFR (Building Frame), BLA* (Building Lath*), B= (Building Final) ES* (Electrical Service*), ER* (Electrical Rough*), ER= (Electrical Rough and Final), E= (Electrical Final)
DECK STAIR REPLACEMENT BFR (Building Frame), B= (Building Final) ES* (Electrical Service*), E=* (Electrical Final*) H= (Heating Final)
DECK WITH COVER (NO ELECTRIC) BFT (Building Footing), BFR (Building Frame), BLA* (Building Lath*), BTR* (Building Tile Roof*), B= (Building Final)
DECK WITH COVER (W/ ELECTRIC) BFT (Building Footing), BFR (Building Frame), BLA* (Building Lath*), BTR* (Building Tile Roof*), B= (Building Final) ES* (Electrical Service*), ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final)
DETACHED GARAGE (W/O POWER) BFT (Building Footing), BFN (Building Foundation), BFR (Building Frame), BLA* (Building Lath*), BTR* (Building Tile Roof*), B= (Building Final) HRP (Heating Refrigeration Piping)
DETACHED GARAGE (W/ POWER) BFT (Building Footing), BFN (Building Foundation), BFI (Building Foundation Insulation), BFR (Building Frame), BIN* (Building Insulation*), BLA* (Building Lath*), BTR* (Building Tile Roof*), B= (Building Final), BEN=* (Building Energy Final*) ES* (Electrical Service*), ER (Electrical Rough), ERS* (Electrical Rough and Service*), ES=* (Electrical Service and Final*), EUG* (Electrical Underground*), E=* (Electrical Final*) HRP (Heating Refrigeration Piping)
ELECTRIC PANEL CHANGE-OUT ESPR* (Electrical Service Pre-release*), ES (Electrical Service), ES=* (Electrical Service and Final*), EP (Electrical Panel), E= (Electrical Final)
ELECTRIC PANEL UPGRADE ESPR* (Electrical Service Pre-release*), ES (Electrical Service), ES=* (Electrical Service and Final*), E= (Electrical Final)
ELECTRIC SUB PANEL (NEW) ER=* (Electrical Rough and Final*), EP (Electrical Panel), E= (Electrical Final)
FIREPLACE FRAMING BFR (Building Frame), B= (Building Final) ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), E= (Electrical Final)
FURNACE REPLACEMENT E=* (Electrical Final*) H= (Heating Final)
GARAGE CONVERSION BIN (Building Insulation), BLA (Building Lath), B= (Building Final), BEN=* (Building Energy Final*) ES* (Electrical Service*), ER (Electrical Rough), ERS* (Electrical Rough and Service*), E= (Electrical Final) HI* (Heating Inside*), HRR (Heating Residential Rough), H= (Heating Final) PB* (Plumbing Base*), PTO* (Plumbing Top Out*), PIN* (Plumbing Insulation*), P=* (Plumbing Final*)
HOT TUB (NEW) ES* (Electrical Service*), ES=* (Electrical Service and Final*), E= (Electrical Final)
INTERIOR REMODEL (NON-STRUCTURAL) BFR (Building Frame), B= (Building Final) ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), ESL* (Electrical Slab*), E=* (Electrical Final*) HI (Heating Inside), HWP* (Heating Process Steam and Water Pipe*), HRR (Heating Residential Rough), H= (Heating Final) PB* (Plumbing Base*), PTO* (Plumbing Top Out*), PIN* (Plumbing Insulation*), P= (Plumbing Final)
INTERIOR REMODEL (STRUCTURAL) BFR (Building Frame), B= (Building Final) ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), ESL* (Electrical Slab*), E=* (Electrical Final*) HI (Heating Inside), HWP* (Heating Process Steam and Water Pipe*), HRR (Heating Residential Rough), H= (Heating Final) PB* (Plumbing Base*), PTO* (Plumbing Top Out*), PIN* (Plumbing Insulation*), P= (Plumbing Final)
KITCHEN HOOD (NEW) ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) H= (Heating Final)
METER RESET (ELECTRIC) ES (Electrical Service), ES=* (Electrical Service and Final*), EMR* (Electrical Meter Release*), E= (Electrical Final)
METER RESET (GAS) HI (Heating Inside), H= (Heating Final)
NEW A/C ES* (Electrical Service*), ES=* (Electrical Service and Final*), E= (Electrical Final) H= (Heating Final)
NEW EXTERIOR GAS LINE HO (Heating Outside), H= (Heating Final)
NEW FIREPLACE INSTALL (GAS) BFR (Building Frame), B= (Building Final) ER (Electrical Rough), ER=* (Electrical Rough and Final*), E= (Electrical Final) HI (Heating Inside), HO* (Heating Outside*), HV (Heating Vent), H= (Heating Final)
NEW INTERIOR GAS LINE HI (Heating Inside), H= (Heating Final)
NEW WOODBURNING STOVE BFR (Building Frame), B= (Building Final)
PATIO COVER BFT (Building Footing), BFR (Building Frame), BLA* (Building Lath*), BTR* (Building Tile Roof*), B= (Building Final) ES* (Electrical Service*), ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), E=* (Electrical Final*)
PATIO ENCLOSURE BFT (Building Footing), BFR (Building Frame), BTR* (Building Tile Roof*), B= (Building Final) ES* (Electrical Service*), ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) HI* (Heating Inside*), HO* (Heating Outside*)
PERGOLA BFT (Building Footing), BFR (Building Frame), BTR* (Building Tile Roof*), B= (Building Final) ES* (Electrical Service*), ER* (Electrical Rough*), ERS* (Electrical Rough and Service*), ER=* (Electrical Rough and Final*), EUG* (Electrical Underground*), E= (Electrical Final)
PV SOLAR (NEW GROUND MOUNT UP TO 7FT) ES (Electrical Service), ER (Electrical Rough), E= (Electrical Final)
PV SOLAR (NEW GROUND MOUNT OVER 7FT) BFT (Building Footing), B= (Building Final) ES (Electrical Service), ER (Electrical Rough), E= (Electrical Final)
PV SOLAR (NEW ROOF MOUNT) BPV (Solar Attachment), B=* (Building Final*) ES (Electrical Service), ER (Electrical Rough), E= (Electrical Final)
BPV (Solar Attachment, Electric-Only Permit)
PV SOLAR (REMOVE AND REPLACE) BPV (Solar Attachment), B= (Building Final) ER* (Electrical Rough*), E= (Electrical Final),
BPV (Solar Attachment, Electric-Only Permit)
RE-ROOF (ASPHALT) B=R (Building Roofing Final) ESPR* (Electrical Service Pre-release*), ES* (Electrical Service*), E=* (Electrical Final*)
RE-ROOF (TILE) BTR (Building Tile Roof), B=R (Building Roofing Final) ESPR* (Electrical Service Pre-release*), ES* (Electrical Service*), E=* (Electrical Final*)
RESIDENCE BFT (Building Footing), BFN (Building Foundation), BFD (Building Foundation Drain), BFI (Building Foundation Insulation), BFR (Building Frame), BIN (Building Insulation), BLA* (Building Lath*), BTR* (Building Tile Roof*), B= (Building Final), BEN= (Building Energy Final) EUG* (Electrical Underground*), ES (Electrical Service), ER (Electrical Rough), ERS* (Electrical Rough and Service*), E= (Electrical Final) HI* (Heating Inside*), HWP* (Heating Process Steam and Water Pipe*), HRR (Heating Residential Rough), H= (Heating Final) PB (Plumbing Base), PTO (Plumbing Top Out), PIN (Plumbing Insulation), P= (Plumbing Final)
SERVICE UPGRADE BFR (Building Frame), B= (Building Final) ESPR* (Electrical Service Pre-release*), ES (Electrical Service), ES= (Electrical Service and Final), EUG* (Electrical Underground*), E= (Electrical Final)
SIDING B= (Building Final) ES* (Electrical Service*), ER* (Electrical Rough*), E=* (Electrical Final*)
SOLAR THERMAL (NEW ROOF MOUNT) BFR (Building Frame), B= (Building Final) ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), E=* (Electrical Final*) HWP* (Heating Process Steam and Water Pipe*), H= (Heating Final) PIN* (Plumbing Insulation*), P= (Plumbing Final)
SOLAR THERMAL (REPLACEMENT ROOF) BFR (Building Frame), B= (Building Final) H=* (Heating Final*) PIN* (Plumbing Insulation*), P=* (Plumbing Final*)
STUCCO BLA (Building Lath), B= (Building Final) ES* (Electrical Service*), ER* (Electrical Rough*), E=* (Electrical Final*)
TEMP SERVICE (ELECTRIC) EST (Electrical Service Temporary), E= (Electrical Final)
ELECTRIC UNIT HEATER (ADDED TO EXISTING) ES* (Electrical Service*), ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final)
GAS UNIT HEATER (ADDED TO EXISTING) ES* (Electrical Service*), ER (Electrical Rough), ER= (Electrical Rough and Final), E= (Electrical Final) HI* (Heating Inside*), H= (Heating Final)
WATER HEATER REPLACEMENT E=* (Electrical Final*) HI* (Heating Inside*), H=* (Heating Final*) P= (Plumbing Final)
WOOD STOVE INSERT BFR (Building Frame), B= (Building Final) ER* (Electrical Rough*), ER=* (Electrical Rough and Final*), E=* (Electrical Final*)
WOODBURNING STOVE (REPLACE) BFR (Building Frame), B= (Building Final)
Project Description Required Inspections (Hover or tap codes for more info)
ELECTRICAL ES ER ERS ER= ES= EST ESL EUG EP EMR E=
A/C REPLACEMENT X
ADDING RECEPTACLES X X X* X
ADDITION X* X X* X
BASEMENT FINISH X* X X* X* X* X
BATH EXHAUST FAN (NEW) X X X
BOILER INSTALL (NEW) X X X
BOILER REPLACEMENT (W/ VENT) X* X* X*
DECK X* X* X* X*
DECK STAIR REPLACEMENT X* X*
DECK WITH COVER (NO ELECTRIC) X* X*
DECK WITH COVER (W/ ELECTRIC) X* X X X
DETACHED GARAGE (W/O POWER) X* X* X* X*
DETACHED GARAGE (W/ POWER) X* X X* X X* X X
ELECTRIC PANEL CHANGE-OUT X X* X X
ELECTRIC PANEL UPGRADE X X* X
ELECTRIC SUB PANEL (NEW) X* X X
FIREPLACE FRAMING X* X* X*
FURNACE REPLACEMENT X*
GARAGE CONVERSION X* X X* X
HOT TUB (NEW) X* X* X
INTERIOR REMODEL (NON-STRUCTURAL) X* X* X* X*
INTERIOR REMODEL (STRUCTURAL) X* X* X* X*
KITCHEN HOOD (NEW) X X X
METER RESET (ELECTRIC) X X* X* X
METER RESET (GAS)
NEW A/C X* X* X
NEW EXTERIOR GAS LINE
NEW FIREPLACE INSTALL (GAS) X
NEW INTERIOR GAS LINE
NEW WOODBURNING STOVE
PATIO COVER X* X* X* X*
PATIO ENCLOSURE X* X X X
PERGOLA X* X* X* X* X* X*
PV SOLAR (NEW RACK MOUNT) X X* X X
PV SOLAR (NEW ROOF MOUNT) X X X
PV SOLAR (REPLACEMENT ROOF MOUNT) X* X
RE-ROOF (ASPHALT) X* X*
RE-ROOF (TILE) X* X*
RESIDENCE X* X X* X
SERVICE UPGRADE X X X* X
SIDING X* X* X*
SOLAR THERMAL (NEW ROOF MOUNT) X* X* X*
SOLAR THERMAL (REPLACEMENT ROOF)
STUCCO X* X* X*
TEMP SERVICE (ELECTRIC) X
UNIT HEATER (ADDED TO EXISTING) X* X X X
WATER HEATER REPLACEMENT X*
WOOD STOVE INSERT X* X* X*
WOODBURNING STOVE (REPLACE)
Project Description Required Inspections (Hover or tap codes for more info)
MECHANICAL HD HI HO HWP HRR HV HLP HRP H=
A/C REPLACEMENT X
ADDING RECEPTACLES
ADDITION X* X* X X
BASEMENT FINISH X X* X X
BATH EXHAUST FAN (NEW) X
BOILER INSTALL (NEW) X X X
BOILER REPLACEMENT (W/ VENT) X* X
DECK
DECK STAIR REPLACEMENT X
DECK WITH COVER (NO ELECTRIC)
DECK WITH COVER (W/ ELECTRIC)
DETACHED GARAGE (W/O POWER) X*
DETACHED GARAGE (W/ POWER) X*
ELECTRIC PANEL CHANGE-OUT
ELECTRIC PANEL UPGRADE
ELECTRIC SUB PANEL (NEW)
FIREPLACE FRAMING
FURNACE REPLACEMENT X
GARAGE CONVERSION X* X X
HOT TUB (NEW)
INTERIOR REMODEL (NON-STRUCTURAL) X X* X X
INTERIOR REMODEL (STRUCTURAL) X X* X X
KITCHEN HOOD (NEW) X
METER RESET (ELECTRIC)
METER RESET (GAS) X X
NEW A/C X
NEW EXTERIOR GAS LINE X X
NEW FIREPLACE INSTALL (GAS) X X* X X
NEW INTERIOR GAS LINE X X
NEW WOODBURNING STOVE
PATIO COVER
PATIO ENCLOSURE X* X*
PERGOLA
PV SOLAR (NEW RACK MOUNT)
PV SOLAR (NEW ROOF MOUNT)
PV SOLAR (REPLACEMENT ROOF MOUNT)
RE-ROOF (ASPHALT)
RE-ROOF (TILE)
RESIDENCE X* X* X X
SERVICE UPGRADE
SIDING
SOLAR THERMAL (NEW ROOF MOUNT) X* X
SOLAR THERMAL (REPLACEMENT ROOF) X*
STUCCO
TEMP SERVICE (ELECTRIC)
UNIT HEATER (ADDED TO EXISTING)
WATER HEATER REPLACEMENT (*PLUMBING ONLY) *
WOOD STOVE INSERT
WOODBURNING STOVE (REPLACE)
Project Description Required Inspections (Hover or tap codes for more info)
PLUMBING PB UBS PTO PWO PT UWS PBP P=S P=
A/C REPLACEMENT
ADDING RECEPTACLES
ADDITION X X X
BASEMENT FINISH X X X
BATH EXHAUST FAN (NEW)
BOILER INSTALL (NEW)
BOILER REPLACEMENT (W/ VENT)
DECK
DECK STAIR REPLACEMENT
DECK WITH COVER (NO ELECTRIC)
DECK WITH COVER (W/ ELECTRIC)
DETACHED GARAGE (W/O POWER)
DETACHED GARAGE (W/ POWER)
ELECTRIC PANEL CHANGE-OUT
ELECTRIC PANEL UPGRADE
ELECTRIC SUB PANEL (NEW)
FIREPLACE FRAMING
FURNACE REPLACEMENT
GARAGE CONVERSION X* X* X*
HOT TUB (NEW)
INTERIOR REMODEL (NON-STRUCTURAL) X* X X
INTERIOR REMODEL (STRUCTURAL) X X X
KITCHEN HOOD (NEW)
METER RESET (ELECTRIC)
METER RESET (GAS)
NEW A/C
NEW EXTERIOR GAS LINE
NEW FIREPLACE INSTALL (GAS)
NEW INTERIOR GAS LINE
NEW WOODBURNING STOVE
PATIO COVER
PATIO ENCLOSURE
PERGOLA
PV SOLAR (NEW RACK MOUNT)
PV SOLAR (NEW ROOF MOUNT)
PV SOLAR (REPLACEMENT ROOF MOUNT)
RE-ROOF (ASPHALT)
RE-ROOF (TILE)
RESIDENCE X X X
SERVICE UPGRADE
SIDING
SOLAR THERMAL (NEW ROOF MOUNT) X
SOLAR THERMAL (REPLACEMENT ROOF) X*
STUCCO
TEMP SERVICE (ELECTRIC)
UNIT HEATER (ADDED TO EXISTING)
WATER HEATER REPLACEMENT X
WOOD STOVE INSERT
WOODBURNING STOVE (REPLACE)