processing

Please Wait...

RBD Current Building Permit Fee Schedule

2023 ICC Valuation Data Effective Friday June 30th, 2023

Permit Fee Calculator


View the Woodland Park Permit Fee Schedule

ICC Building Valuation- TABLE A International Code Council Valuations

  • For all commercial buildings – Regional Modifier is .97 of the construction type and occupancy valuation
  • For all new single family dwellings – Regional Modifier is .27 of $167.37
  • For garages constructed with and attached to new single family dwellings – Regional Modifier is .14 of $167.37
  • For additions, garage conversions, and basement finishes – Regional Modifier is .27 of $167.37 per square foot plus electrical, mechanical, and plumbing permit fees are based on job (contract) cost per Table C
  • For detached garages to an existing residence – Regional Modifier is .91 of $66.48
  • Use the Permit Fee Calculator to calculate your permit fee

Appendix B: Fee Schedule

Pursuant to Section RBC108.2 of the 2023 Pikes Peak Regional Building Code, the following represents the fee schedule adopted by the participating jurisdictions.

COMMERCIAL AND RESIDENTIAL - NEW CONSTRUCTION AND ALTERATION TABLE A: This permit fee table shall apply as follows:

  • For all new construction, alterations, additions, conversions, and repairs to any commercial building or structure; fees include building inspection only. See Table B for fees for plumbing, electrical, gas and heating inspections
  • For all new construction of one- and two-family dwellings and their accessory structures; fees include plumbing, electrical, gas, heating, and building inspections.
  • Final building permit valuation shall be set by the Building Official. Regional modifiers used in the application of the adopted ICC Building Valuation Data shall be set by the Regional Building Commission.

TABLE A:

VALUATION PERMIT FEE
$1 to $500 $50.00
$501 to $2,000 $50.00 for the first $500 plus $2.00 for each additional $100 or fraction thereof, to and including $2,000
$2,001 to $25,000 $80.00 for the first $2,000 plus $8.00 for each additional $1,000 or fraction thereof, to and including $25,000
$25,001 to $50,000 $264.00 for the first $25,000 plus $8.00 for each additional $1,000 or fraction thereof, to and including $50,000
$50,001 to $100,000 $464.00 for the first $50,000 plus $5.00 for each additional $1,000 or fraction thereof, to and including $100,000
$100,001 to $500,000 $714.00 for the first $100,000 plus $4.00 for each additional $1,000 or fraction thereof, to and including $500,000
$500,001 to $1,000,000 $2,314.00 for the first $500,000 plus $3.50 for each additional $1,000 or fraction thereof, to and including $1,000,000
$1,000,000 and more $4,064.00 for the first $1,000,000 plus $3.00 for each additional $1,000 or fraction thereof

TABLE A.1: Building permit fees for reroofing, stucco, siding, and basement finish of existing one- and two-family dwellings and townhomes.

MATERIAL PERMIT FEE
Asphalt Shingle Reroof $135.00
Stucco $135.00
Wood / Composite Siding $115.00
Basement Finish $300.00

TABLE B: Permit attachment fees for plumbing, electrical, gas, and heating permit(s) associated with a commercial building permit.

PERMIT ATTACHMENT FEE $100.00 for each trade

TABLE B.1: Permit attachment fees for plumbing, electrical, gas, and heating permits(s) associated with a detached accessory structure or alteration(s) of one- and two-family dwellings.

PERMIT ATTACHMENT FEE $50.00 for each trade

TABLE C: Permit fees for electrical, heating, gas, and plumbing permits not associated with a building permit.

VALUATION PERMIT FEE
$100 to $500 $50.00
$501 to $2,000 $50.00 for the first $500 plus $5.50 for each additional $100 or fraction thereof, up to and including $2,000
$2,001 to $5,000 $132.50 for the first $2,000 plus $1.45 for each additional $100 or fraction thereof, up to and including $5,000
$5,001 to $50,000 $176.00 for the first $5,000 plus $6.75 for each additional $1,000 or fraction thereof, up to and including $50,000
$50,001 and more $480.00 for the first $50,000 plus $4.50 for each additional $1,000 or fraction thereof
INDIVIDUAL RESIDENTIAL MECHANICAL & PLUMBING PERMIT FEES
Gas Log or Fireplace Insert Installation $40.00
Water Heater Replacement $40.00
Air Conditioning Condensing Unit Replacement $30.00
Lawn Sprinkler Backflow Prevention Device / Water Softener Installation $30.00
Air Conditioning Installation (coil and condenser); Furnace; Wall/Space Heater; or Boiler Replacement $50.00
Water Heater, Furnace, or Boiler Replacement, including vent $75.00
INDIVIDUAL COMMERCIAL MECHANICAL & PLUMBING PERMIT FEES
Roof Top Replacement (7.5 tons or less) $50.00
Water Heater, Unit Heater, Furnace, or Boiler Replacement (400,000 BTU or less) $50.00
Air Conditioning Condensing Unit Replacement / Backflow Prevention Device $50.00
Roof Top Replacement (> 7.5 tons) $100.00
Water Heater, Furnace, or Boiler Replacement (> 400,000 BTU) / Chiller Replacement $100.00

TABLE D: Floodplain and Enumerations

FLOODPLAIN PERMIT
SQUARE FEET OF DISTURBED AREA PERMIT FEE
UP TO 1,500 $50.00
1,500 TO 5,000 $150.00
5,000 TO 15,000 $300.00
OVER 15,000 $500.00
INDIVIDUAL ITEM FEES
Floodplain review, tracking, and inspection services $50.00/Hour
Determination of property location in 100-year floodplain $30.00
Address Determination or Verification $30.00
Determination of property location in 100-year floodplain and address at time of final plat $10.00/lot

TABLE E: Other Fees

A. Wrecking Permit Fee $30.00
B. Moving Permit Fee
Exception: The fee for moving a building without moving on a public thoroughfare shall be covered by an alteration permit. Wrecking and moving permit fees do not include the services of any other governmental agency.
$30.00
C. Sign Permit Fee (Base Fee) $30.00
  Sign Inspections beyond the first inspection $25.00
D. Manufactured Home Permit $240.00
  Manufactured Home State insignia, as issued by the State of Colorado, Division of Housing Equal to the cost of the insignia
E. Inspection outside of normal business hours (Minimum charge two hours) $100.00/Hour
F. Inspection consultation $100.00
G. Plan Examination Fee:
(There shall be a $50.00 handling fee for each use of a "Master Plan" for single family dwellings.)
28% of Building Permit Fee
H. Plan Examination required by changes, additions, or revisions to approved plans, records search, or other services for which no fee is specifically indicated. 28% of Building Permit Fee
  Additional Plan Examination fee after second disapproval of plans. $50.00/Hour
I. Conveyance Permit Fee - Elevator: The fee for a permit to operate any elevator equipment governed by Section 1.1 of the Safety Code for Elevators and Escalators $177.00
J. Conveyance Permit Fee - Escalator: The fee for a permit to operate any escalator equipment governed by Section 1.1 of the Safety Code for Elevators and Escalators $355.00
K. Temporary Certificate of Occupancy $50.00
L. Phased Temporary Certificate of Occupancy (to include administrative review) $150.00
  Each additional phased Temporary Certificate of Occupancy $100.00
M. Duplicate Copy of Certificate of Occupancy for existing buildings $10.00
N. Address Determination or Verification $30.00
O. Request for Address change (Payment to be submitted with request) $50.00
P. Election Application for Variance $50.00
  Paper Application for Variance $10.00
Q. Alternate Materials and Method Application $50.00
R. Investigation Fee: Work without a Permit.
Investigation: Whenever any work for which a permit is required by this Code has been commenced without first obtaining said permit, a special investigation shall be made before a permit may be issued for such work.
Fee: An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to twice the amount of the permit fee that would be required by this Code if a permit were issued. The payment of such an investigation fee shall not exempt any person from compliance with any provisions of this Code nor from any prescribed by law.
Equal to two times the Permit Fee
S. Re-inspection Fees:

A re-inspection fee may be assessed for each inspection or re-inspection when such portion of work for which inspection is requested is not complete, when corrections required by a previous inspection have not been made, or when an additional inspection is required for alterations made after completion of initial inspection

This is not to be interpreted as requiring re-inspection fees the first time a job is rejected for failure to comply with the requirements of the technical codes, but as controlling the practice of requesting inspections before the job is ready for such an inspection or re-inspection
Re-inspection fees may be assessed when the permit card is not properly posted on the work site; the approved plans are not readily available to the inspector, for failure to provide access on the date for which inspection is requested, or for deviating from plans requiring the approval of the Building Official.
In instances where re-inspection fees have been assessed, no additional inspection of the work will be performed until such fees have been paid.
$50.00 for 1st incident
$100.00 for 2nd incident
$200.00 for 3rd incident,
plus 2 work day inspection delay
T. Annual Permit Fee: The cost of an annual permit shall be determined by the Building Official, based on the amount and scope of work, and the cost to the department to oversee the permit activities.